Tool

Build the maintenance case

Net = avoided failures × (unplanned − planned cost) − false-alert cost − running cost

Enter your failure history, what you expect condition monitoring or AI to predict in time, and the costs. The calculator gives the failures avoided, the yearly saving, the false-alert and running costs, the net benefit, the payback, the three-year net, and the share of failures the system must predict just to break even. Load the example to see a 40-machine pilot.

Everything runs in your browser. Nothing is sent to a server, and entries are not saved between visits. The example is made-up data. Use your own failure records and costs.

Result

Does it pay?

Failures per year (today)
--
Failures avoided per year
--
Saving per year
--
Net benefit per year
--
Payback (months)
--
Break-even share predicted
--
Enter the case to see the result.

Picture

Where the money goes each year

Sensitivity: each input moved 30% down and 30% up

Share predicted is capped at 100%.

Instructions

How to use this calculator

  1. Count the unplanned failures on the machines you would cover over the last two or three years, and work out the real cost of one, including lost production, repair, scrap, and overtime.
  2. Estimate what the same repair costs when planned. The saving from predicting a failure is the difference.
  3. Enter the share of failures the system would predict in time, ideally from a pilot, with the false alerts it raises and what each costs to check.
  4. Add the yearly running cost and the one-time cost.
  5. Read the net benefit, the payback, and the break-even share. If the break-even share is higher than a pilot can plausibly deliver, the case is weak.

What This Maintenance and Automation ROI Calculator Does

Predictive maintenance and condition monitoring promise to turn costly unplanned failures into cheaper planned repairs. This calculator tests that promise with your own numbers. It takes your failure history, the share of failures the system would predict in time, the cost of an unplanned failure and of the same repair when planned, the false alerts and what each costs to check, and the running and one-time costs. It returns the failures avoided, the yearly saving, the net benefit after false-alert and running costs, the payback, the three-year net, and the break-even share of failures the system must predict.

It matches the worked pilot in the AI for Safety, Maintenance, and Reliability guide. For general AI use cases use the AI Business Case and ROI Calculator.

The Calculation

LineFormula
Failures per year todayMachines × failures per machine per year
Failures avoidedFailures × share predicted in time
Saving per yearFailures avoided × (cost of an unplanned failure − cost of the planned repair)
False-alert cost per yearMachines × false alerts per machine × cost of checking one
Net benefit per yearSaving − false-alert cost − running cost
PaybackOne-time cost ÷ net benefit per year × 12 months
Break-even share predicted(false-alert cost + running cost) ÷ (failures per year × (unplanned cost − planned cost))

Worked Example

The pre-loaded example is a pilot on 40 machines at an illustrative plant: 0.6 failures per machine a year, 35% predicted in time, $9,000 for an unplanned failure against $2,200 planned, 1 false alert per machine a year at $250, $14,000 a year to run, and $30,000 to set up. That avoids 8.4 failures a year and saves $57,120; after $10,000 of false-alert cost and $14,000 of running cost the net benefit is $33,120 a year, with payback in about 11 months.

Limits and Good Practice

Maintenance and Automation ROI Calculator Frequently Asked Questions

What is the break-even share predicted?

The share of failures the monitoring system must predict in time for the saving to cover the false-alert and running costs. If it is higher than a pilot can plausibly achieve, the case is weak. It is a good number to compare with pilot results.

What should I count as the cost of an unplanned failure?

Everything the failure costs: lost production or throughput, repair parts and labor, scrap, expediting, overtime, and customer penalties if any. The planned repair cost is what the same repair costs when scheduled in a convenient window, usually with lower downtime and fewer rush charges.

How do I estimate the share of failures predicted?

From a pilot: count the failures on the covered machines and how many had a correct alert early enough to plan. With few failures the estimate is uncertain, so use an exact interval and test the case at the low end. The AI for Safety, Maintenance, and Reliability guide shows an example.

Why include false alerts?

Because each alert has to be checked, and checking costs time and sometimes a stoppage. Too many false alerts also cause people to ignore the system. The cost of false alerts can cancel the saving when monitoring is poorly tuned.

Is my data stored anywhere?

No. The calculator runs entirely in your browser, nothing is sent to a server, and your entries are not saved when you leave the page.